Osisko Metals announced initial drilling results for Pine Point Zn-Pb Project
2021-09-28 10:51:58 [Print]
On Sept
Shallow mineralization was intersected between 18 and 37 metres vertical depth. Highlights include:
- Drill hole Z60-21-PP-006 intersected 10.70 metres grading 10 . 50% Zn and 0 . 25% Pb (10 . 75% Zn+Pb) in a prismatic build-up of mineralization.
- Drill hole Z60-21-PP-001 intersected 4.5 metres grading 17 . 95% Zn and 2 . 25% Pb (20 . 20% Zn+Pb) in prismatic-style mineralization.
. 27, Canada-based Osisko Metals Incorporated announced initial results from the current in-fill and hydrogeological drill program at its Pine Point Project, located in the NWT.Shallow mineralization was intersected between 18 and 37 metres vertical depth. Highlights include:
- Drill hole Z60-21-PP-006 intersected 10.70 metres grading 10 . 50% Zn and 0 . 25% Pb (10 . 75% Zn+Pb) in a prismatic build-up of mineralization.
- Drill hole Z60-21-PP-001 intersected 4.5 metres grading 17 . 95% Zn and 2 . 25% Pb (20 . 20% Zn+Pb) in prismatic-style mineralization.