Osisko Metals announced initial drilling results for Pine Point Zn-Pb Project
2021-09-28 10:51:58 [Print]
On Sept. 27, Canada-based Osisko Metals Incorporated announced initial results from the current in-fill and hydrogeological drill program at its Pine Point Project, located in the NWT.
Shallow mineralization was intersected between 18 and 37 metres vertical depth. Highlights include:
- Drill hole Z60-21-PP-006 intersected 10.70 metres grading 10.50% Zn and 0.25% Pb (10.75% Zn+Pb) in a prismatic build-up of mineralization.
- Drill hole Z60-21-PP-001 intersected 4.5 metres grading 17.95% Zn and 2.25% Pb (20.20% Zn+Pb) in prismatic-style mineralization.
Shallow mineralization was intersected between 18 and 37 metres vertical depth. Highlights include:
- Drill hole Z60-21-PP-006 intersected 10.70 metres grading 10.50% Zn and 0.25% Pb (10.75% Zn+Pb) in a prismatic build-up of mineralization.
- Drill hole Z60-21-PP-001 intersected 4.5 metres grading 17.95% Zn and 2.25% Pb (20.20% Zn+Pb) in prismatic-style mineralization.

