• Calcium Ingot Reductive 98%min EXW Chinaup(450)  07-02|Silicon Metal 7-8-3 Ex-VAT FOB Chinaup(30)  07-02|Silicon Metal 5-5-3 Ex-VAT FOB Chinaup(30)  07-02|Lithium Carbonate 99.2%min Delivered Chinaup(1500)  07-02|Silicon Metal 7-8-3 FOB Chinaup(30)  07-02|Silicon Metal 4-4-1 Ex-VAT FOB Chinaup(30)  07-02|Silicon Metal 5-5-3 FOB Chinaup(30)  07-02|Lithium Carbonate 99.5%min Delivered Chinaup(1500)  07-02|Silicon Metal 4-4-1 FOB Chinaup(30)  07-02|Bismuth Ingot 99.99%min EXW Chinadown(-3000)  07-02|Yttrium Oxide 99.999%min FOB Chinaup(0.2)  07-02|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-02|Silicon Metal 3-3-03 Ex-VAT FOB Chinaup(30)  07-02|Bismuth Oxide 99.9%min EXW Chinadown(-3000)  07-02
  • Liaoning: To avoid power curtailment to the greatest extent

    2021-09-27 11:06:38   [Print]
    On 26 September, Liaoning Provincial Industry and Informatization Department and State Grid Liaoning Electric Power Supply Co.Asian Metal Copyright State Grid Liaoning Electric Power Supply Co.Asian Metal Copyright, Ltd.Asian Metal Copyright State Grid Liaoning Electric Power Supply Co.Asian Metal Copyright held the provincial power guarantee meeting.

    According to the meeting, Liaoning Provincial Industry and Informatization Department is required to strengthen supervision and inspection on implementation of orderly power utilization, ensure proper implementation of orderly power utilization and prevent power curtailment from making negative impacts on work safety, people's livelihood and important users. State Grid Liaoning Electric Power Supply Co.Asian Metal Copyright is required to extend forecasting period and warning level issuance period of orderly power utilization load gap and expand scope of notification for users to make power utilization plans in advance.Asian Metal Copyright, Ltd.Asian Metal Copyright State Grid Liaoning Electric Power Supply Co.Asian Metal Copyright is required to extend forecasting period and warning level issuance period of orderly power utilization load gap and expand scope of notification for users to make power utilization plans in advance.

    .Asian Metal Copyright held the provincial power guarantee meetingAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.