• Ferro-tungsten 70%min EXW Chinaup(25000)  02-02|Lithium Carbonate 99.2%min Delivered Chinadown(-4500)  02-02|Aluminum Alloy Ingot A356.2 Delivered Chinadown(-730)  02-02|Zinc Ingot 99.995%min In warehouse Guangzhoudown(-770)  02-02|Zinc Ingot 99.995%min In warehouse Tianjindown(-770)  02-02|Aluminum Ingot 99.7%min In warehouse Gongyidown(-730)  02-02|Zinc Ingot 99.995%min In warehouse Shanghaidown(-770)  02-02|Aluminum Ingot 99.7%min In warehouse Foshandown(-730)  02-02|Aluminum Ingot 99.7%min In warehouse Wuxidown(-730)  02-02|Ferro-tungsten 75%min EXW Chinaup(25000)  02-02|Lithium Carbonate 99.5%min Delivered Chinadown(-4500)  02-02|Cobalt Metal 99.8%min Delivered Chinadown(-13)  02-02|Zinc Die-casting Alloy Zamak-3 EXW Chinadown(-770)  02-02|Copper Cathode 99.99%min Delivered Chinadown(-3000)  02-02
  • Major Precious Metals completed Phase 1 diamond drilling program at Skaergaard project

    2021-09-18 11:48:49   [Print]
    Canada-based Major Precious Metals Corp.Asian Metal Copyright The drilling program covered an area of around 10 square kilometers km2 within the 7.Asian Metal Copyright announced that it has successfully completed its Phase 1 diamond drilling program at its flagship Skaergaard project, in eastern Greenland.

    The drilling program covered an area of around 10 square kilometers (km2) within the 7.5km east-west by 11km north-south Skaergaard intrusion, including key new target zones in the northern part of the project.

    The company said the new drilling aimed to uplift and expand the existing mineral resource in the four main mineralized horizons at Skaergaard and verify the potential for vanadium, titanium, iron, gallium, and other secondary elements in the intermediate mineralized levels.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.