• Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-15|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-15|Tin Conc. 60%min Delivered Chinaup(20000)  01-15|Tin Ingot 99.95%min EXW Chinaup(20000)  01-15|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-15|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-15|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-15|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-15|Spodumene Li2O 6%min CIF Chinaup(60)  01-15|Lithium Manganate Mn 58% Delivered Chinaup(1400)  01-15|Zinc Ingot 99.995%min In warehouse Guangzhouup(730)  01-15|Zinc Ingot 99.995%min In warehouse Tianjinup(730)  01-15|Zinc Ingot 99.99%min EXW China up(730)  01-15|Zinc Ingot 99.995%min In warehouse Shanghaiup(730)  01-15
  • Major Precious Metals completed Phase 1 diamond drilling program at Skaergaard project

    2021-09-18 11:48:49   [Print]
    Canada-based Major Precious Metals Corp.Asian Metal CopyrightCanada-based Major Precious Metals Corp.Asian Metal Copyright announced that it has successfully completed its Phase 1 diamond drilling program at its flagship Skaergaard project, in eastern Greenland.

    The drilling program covered an area of around 10 square kilometers (km2) within the 7.5km east-west by 11km north-south Skaergaard intrusion, including key new target zones in the northern part of the project.

    The company said the new drilling aimed to uplift and expand the existing mineral resource in the four main mineralized horizons at Skaergaard and verify the potential for vanadium, titanium, iron, gallium, and other secondary elements in the intermediate mineralized levels.
    .Asian Metal CopyrightCanada-based Major Precious Metals CorpAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.