• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Zhangshiba Lead-Zinc Mine Project goes into pilot production

    2021-09-14 15:27:29   [Print]
    Zhangshiba Lead-Zinc Mine Project, a major provincial grade project of 945,000tpy invested and built in Dean, Jiangxi, went into pilot production recently after the construction was completed, trying to achieve a daily mining and dressing volume of 3,000t in mid-November.Asian Metal Copyright6309 square meters to excavate zinc ores, lead ores and antimony ores with a designed production scale of 945,000t per year and a designed service period of 20 years.Asian Metal Copyright Containing 3 million tons of metals, the mine is the largest lead-zinc mine discovered so far in China, ranking first in Asia.

    In 2005, Zhangshiba Lead-Zinc Mine Project, whose reserves were ascertained by 916 Geological Party of Jiangxi Bureau of Geology, introduced Tianbao Mining Group (Ningde) Co., Ltd.Asian Metal CopyrightZhangshiba Lead-Zinc Mine Project, a major provincial grade project of 945,000tpy invested and built in Dean, Jiangxi, went into pilot production recently after the construction was completed, trying to achieve a daily mining and dressing volume of 3,000t in mid-November.Asian Metal Copyright for joint development and cooperation in a way of mining right cooperation.Asian Metal Copyright .Asian Metal Copyright In December 2018, the joint venture got the mining license for a mining area of 4.Asian Metal Copyright, Ltd.Asian Metal Copyright6309 square meters to excavate zinc ores, lead ores and antimony ores with a designed production scale of 945,000t per year and a designed service period of 20 years.

    .Asian Metal Copyright6309 square meters to excavate zinc ores, lead ores and antimony ores with a designed production scale of 945,000t per year and a designed service period of 20 yearsAsian Metal Copyright
    Antimony Conc. 50%min Delivered China
    Unit:RMB/mt Sb
    China antimony ingot producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.