• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Temas Resources acquires 100% of Lac Brule Fe-Ti-V Project

    2021-09-14 11:30:54   [Print]
    BEIJING (Asian Metal) 14 Sep 21 - Canada-based Temas Resources Corp.Asian Metal Copyright "The mineralization from this project should be ideal feedstock for our 50% owned ORF Processing Technology, which can process various minerals at a low cost and in an environmentally friendly manner.Asian Metal Copyright announced that it has completed the acquisition of 36 mineral claims in Quebec, the Lac Brule property; 35 claims by staking, and by purchasing one claim.Asian Metal Copyright The pilot plant, for the processing of titanium, vanadium and iron rich material, is expected to be fully operational imminently," said the company.Asian Metal Copyright Total cost for staking and acquisition was less than $50,000 in cash and shares.

    "The mineralization from this project should be ideal feedstock for our 50% owned ORF Processing Technology, which can process various minerals at a low cost and in an environmentally friendly manner. The pilot plant, for the processing of titanium, vanadium and iron rich material, is expected to be fully operational imminently," said the company.

    Historic metallurgical bench tests on Lac Brule mineralization attained 94% TiO2, 95% V2O5 and 99% Fe2O3 successfully leached.
    .Asian Metal Copyright The pilot plant, for the processing of titanium, vanadium and iron rich material, is expected to be fully operational imminently," said the companyAsian Metal Copyright
    Ferro-titanium 70%min EXW India
    Unit:INR/kg
    Ferro-titanium 70%min EXW India INR/kg
    China titanium concentrate producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.