• Stainless HR Coil 201/No.1 6.0mm In warehouse Chinaup(200)  01-16|Lithium Metal 99%min Delivered Chinaup(22000)  01-16|Aluminum Fluoride 61%min EXW Chinadown(-300)  01-16|Yttrium Oxide 99.999%min EXW Chinaup(1500)  01-16|Ferro-vanadium 80%min In warehouse Pittsburghup(0.8)  01-16|Spodumene Li2O 3%min In port Chinaup(50)  01-16|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinaup(20)  01-16|Lithium Metal 99.9%min Delivered Chinaup(22000)  01-16|Stainless CR Coil 201/2B 1.0mm In warehouse Chinaup(200)  01-16|Spodumene Li2O 5%min In port Chinaup(60)  01-16|Antimony Ingot 99.65%min In port Indiadown(-80)  01-16|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(40)  01-16|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(200)  01-16|Tantalum Pentoxide 99.5%min EXW Chinaup(50)  01-16
  • Temas Resources acquires 100% of Lac Brule Fe-Ti-V Project

    2021-09-14 11:30:54   [Print]
    BEIJING (Asian Metal) 14 Sep 21 - Canada-based Temas Resources Corp.Asian Metal Copyright The pilot plant, for the processing of titanium, vanadium and iron rich material, is expected to be fully operational imminently," said the company.Asian Metal Copyright announced that it has completed the acquisition of 36 mineral claims in Quebec, the Lac Brule property; 35 claims by staking, and by purchasing one claim.Asian Metal Copyright announced that it has completed the acquisition of 36 mineral claims in Quebec, the Lac Brule property; 35 claims by staking, and by purchasing one claim.Asian Metal Copyright Total cost for staking and acquisition was less than $50,000 in cash and shares.

    "The mineralization from this project should be ideal feedstock for our 50% owned ORF Processing Technology, which can process various minerals at a low cost and in an environmentally friendly manner. The pilot plant, for the processing of titanium, vanadium and iron rich material, is expected to be fully operational imminently," said the company.

    Historic metallurgical bench tests on Lac Brule mineralization attained 94% TiO2, 95% V2O5 and 99% Fe2O3 successfully leached.
    .Asian Metal Copyright Historic metallurgical bench tests on Lac Brule mineralization attained 94% TiO2, 95% V2O5 and 99% Fe2O3 successfully leachedAsian Metal Copyright
    Ferro-titanium 70%min EXW India
    Unit:INR/kg
    Ferro-titanium 70%min EXW India INR/kg
    China titanium concentrate producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.