• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Hebei Rongxin Iron and Steel Company releases capacity transfer scheme for construction project

    2021-07-30 14:29:31   [Print]
    On 29 July, the Department of Industry and Information Technology of Hebei released the capacity transfer scheme for construction project of Hebei Rongxin Iron and Steel Co.Asian Metal Copyright Construction project Company Site Facility Capacity 10kt Start time Operation time Transfer ratio Hebei Rongxin Iron and Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright 4# blast furnace of 1,080 cubic meters 33.Asian Metal Copyright to seek public opinions.Asian Metal Copyright25:1 Cancelled project No.Asian Metal Copyright The publication period started from 29 July, 2021 and will end on 25 August, 2021.

    Construction project

    Company

    Site

    Facility

    Capacity (10kt)

    Start time

    Operation time

    Transfer ratio

    Hebei Rongxin Iron and Steel Co., Ltd.

    Plant of Hebei Rongxin Iron and Steel Co., Ltd.

    One blast furnace of 1,550 cubic meters

    133

    Feb 2019

    Jun 2020

    1.25:1

    Two converters of 100t

    230

    1.25:1

    Cancelled project

    No.

    City

    Company

    Facility

    Capacity (10kt)

    Demolition time

    Completion time

    Note

    1

    Tangshan

    Hebei Rongxin Iron and Steel Co., Ltd.

    1# blast furnace of 1,080 cubic meters

    104

    Before the start of operation

    Before the start of operation

     

    2

    Tangshan

    3# blast furnace of 450 cubic meters

    1

    Remaining capacity of 290kt will be sold to Xinda Iron and Steel for capacity transfer of the 1,500-cubic-meter blast furnace

    3

    Tangshan

    4# blast furnace of 480 cubic meters

    28

    Remaining capacity of 290kt will be sold to Xinda Iron and Steel for capacity transfer of the 1,500-cubic-meter blast furnace

    4

    Langfang

    Hebei Qianjin Iron and Steel Group Co., Ltd.

    4# blast furnace of 1,080 cubic meters

    33.25

    The capacity of 332.5kt was purchased from the conversion of iron-making capacity of one million tons of 4# 1,080-cubic-meter blast furnace of Qianjin Iron and Steel purchased by Xinda Iron and Steel

    Total

     

     

     

    166.25

     

     

     

    5

    Tangshan

    Hebei Rongxin Iron and Steel Co., Ltd.

    2# converter of 50t

    76

    Before the start of operation

    Before the start of operation

     

    6

    3# converter of 50t

    76

     

    7

    4# converter of 60t

    85

     

    8

    5# converter of 60t

    50.5

    300kt of the remaining of 345kt will be sold to Xinda Iron and Steel and 45kt will be left for capacity transfer of Rongxin Iron and Steel in future

    Total

     

     

     

    287.5

     

     

     



    .Asian Metal Copyright25 The capacity of 332Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.