• Copper Conc. TC 25%min CIF China(-1)  06-07|Manganese Flake 99.7%min In warehouse Rotterdam(70)  06-07|Mercury Metal 99.9%min Ex-VAT EXW China(40)  06-07|Mercury Metal 99.999%min Ex-VAT EXW China(40)  06-07|Lithium Manganate Mn 58% Delivered China(-1000)  06-07|Aluminum Alloy ADC12 CIF China(-70)  06-07|Ferro-silicon 75%min EXW China(-200)  06-07|Bismuth Oxide 99.9%min EXW China(2000)  06-07|Bismuth Ingot 99.99%min EXW China(2000)  06-07|Zinc Conc. TC 50% CIF China(-0.7)  06-07|Antimony Conc. 50%min Delivered China(3000)  06-07|Ferro-silicon 75%min In warehouse Pittsburgh(-0.03)  06-07|Bismuth Ingot 99.99%min FOB China(0.12)  06-07|Antimony Ingot 99.65%min EXW China(3000)  06-07
  • Jiangsu Miracle to invest in building NCM precursor and battery grade lithium carbonate project

    2021-06-29 17:56:05   [Print]
    Jiangsu Miracle issued a report on signing a framework contract on intentional investment project on June 28th, planning to invest RMB5 billion (USD774.Asian Metal Copyright09 million will be fixed asset investment.Asian Metal Copyright17 million) in building 30,000tpy NCM precursor & 12,000tpy battery grade lithium carbonate project.

    The project will be implemented by Jiangxi Miracle Golden Tiger Co., Ltd.Asian Metal Copyright The construction of the project will be divided into two phases.Asian Metal Copyright, a wholly-owned subsidiary of Jiangsu Miracle, or by a project company established by Jiangsu Miracle in Longnan county.Asian Metal Copyright .Asian Metal Copyright Of the total investment of RMB5 billion (USD774.Asian Metal Copyright, Ltd.Asian Metal Copyright17 million), RMB2.Asian Metal Copyright The project will be implemented by Jiangxi Miracle Golden Tiger Co.Asian Metal Copyright5 billion (USD387.Asian Metal Copyright17 million, RMB2.Asian Metal Copyright09 million) will be fixed asset investment.Asian Metal Copyright The construction of the project will be divided into two phases.Asian Metal Copyright The construction of the project will be divided into two phases.Asian Metal Copyright The construction of the project will be divided into two phases.Asian Metal Copyright The phase one project, which has a planned area of about 164,893 square meters, is expected to start construction in the fourth quarter of 2021 and go into production in the fourth quarter of 2023; the phase two project, with a total planned area of about 100,000 square meters, is expected to commence construction in the fourth quarter of 2022 and go into operation in the fourth quarter of 2024.

    .Asian Metal CopyrightJiangsu Miracle issued a report on signing a framework contract on intentional investment project on June 28th, planning to invest RMB5 billion USD774Asian Metal Copyright
    LNCMO 622 Delivered China
    Unit:RMB/kg
    China lithium nickel cobalt manganese oxide producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.