• Ferro-manganese Mn 65%min, C 7%max EXW China(350)  05-09|Silico-manganese 65/17 EXW China(400)  05-09|Ferro-manganese Mn 75%min, C 8%max EXW China(350)  05-09|Silico-manganese 60/14 EXW China(300)  05-09|Manganese Ore Gabonese 44%min In Qinzhou Port(2)  05-09|Manganese Ore Gabonese 44%min In Tianjin Port(2)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Port(2)  05-09|Manganese Ore Australian 45%min In Qinzhou Port(2)  05-09|Manganese Ore Australian 45%min In Tianjin Port(2)  05-09|Manganese Ore Brazilian 44%min In Tianjin Port(2)  05-09|Manganese Ore Carbonate, Mn 13%min EXW China(1.3)  05-09|Manganese Sulfate Mn 32%min EXW China(200)  05-09|Manganese Ore S.A. 36%min In Qinzhou Port(1.5)  05-09|Manganese Ore S.A. 36%min In Tianjin Port(1.5)  05-09
  • Guangdong Jinshenglan announces plan to build 150-ton electric furnace for steelmaking

    2021-06-22 16:14:43   [Print]
    In accordance with relevant documents, Guangdong Jinshenglan Metallurgical Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright was recently approved to build a 150-ton electric furnace with annual steelmaking capacity of 120,000tpy in Yaogu, Yuncheng, Yunfu, Guangdong.Asian Metal Copyright was recently approved to build a 150-ton electric furnace with annual steelmaking capacity of 120,000tpy in Yaogu, Yuncheng, Yunfu, Guangdong.Asian Metal Copyright The project is scheduled to start construction after Guangdong Industry and Information Technology Office announces the capacity replacement plan and the production is expected to begin in October 2021. 
    .Asian Metal Copyright The project is scheduled to start construction after Guangdong Industry and Information Technology Office announces the capacity replacement plan and the production is expected to begin in October 2021Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.