• Copper Conc. TC 25%min CIF China(-1)  06-07|Manganese Flake 99.7%min In warehouse Rotterdam(70)  06-07|Mercury Metal 99.9%min Ex-VAT EXW China(40)  06-07|Mercury Metal 99.999%min Ex-VAT EXW China(40)  06-07|Lithium Manganate Mn 58% Delivered China(-1000)  06-07|Aluminum Alloy ADC12 CIF China(-70)  06-07|Ferro-silicon 75%min EXW China(-200)  06-07|Bismuth Oxide 99.9%min EXW China(2000)  06-07|Bismuth Ingot 99.99%min EXW China(2000)  06-07|Zinc Conc. TC 50% CIF China(-0.7)  06-07|Antimony Conc. 50%min Delivered China(3000)  06-07|Ferro-silicon 75%min In warehouse Pittsburgh(-0.03)  06-07|Bismuth Ingot 99.99%min FOB China(0.12)  06-07|Antimony Ingot 99.65%min EXW China(3000)  06-07
  • CNGR to establish CNGR New Energy Global R&D Base

    2021-05-18 16:18:42   [Print]
    CNGR announced that its board of directors reviewed and approved its Scheme on Signing a Contract on Settling CNGR New Energy Global R&D Base and 35,000tpy Lithium Battery Precursor Material, Supporting Nickel Cobalt Resource and Battery Recycling Projects in National Grade Economy and Technology Development Zone in Ningxiang with Management Committee of Economic development Zone in Ningxiang.Asian Metal Copyright93 million, and cover about 162,333 square meters with 18-month construction period for the main engineering.Asian Metal Copyright According to the contract, the base and the projects will have a total investment of about RMB1.Asian Metal Copyright93 million, and cover about 162,333 square meters with 18-month construction period for the main engineering.Asian Metal Copyright3 billion (USD202.Asian Metal Copyright .Asian Metal Copyright29 million), including the fixed asset investment of RMB700 million (USD108.Asian Metal Copyright According to the contract, the base and the projects will have a total investment of about RMB1.Asian Metal Copyright93 million), and cover about 162,333 square meters with 18-month construction period for the main engineering.Asian Metal Copyright29 million, including the fixed asset investment of RMB700 million USD108.Asian Metal Copyright The products produced by the base and the projects will be widely used in new energy lithium battery area, power battery area and other areas.
    .Asian Metal Copyright93 million, and cover about 162,333 square meters with 18-month construction period for the main engineeringAsian Metal Copyright
    LNCMO 622 Delivered China
    Unit:RMB/kg
    China lithium nickel cobalt manganese oxide producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.