• Manganese Ore S.A. 36%min In Tianjin Port(3)  05-11|Manganese Ore S.A. 37%min In Tianjin Port(3)  05-11|Manganese Ore Gabonese 44%min In Tianjin Port(3)  05-11|Manganese Ore Carbonate, Mn 13%min EXW China(2)  05-11|Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  05-11|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  05-11|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Tianjin Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  05-11|Copper Conc. TC 25%min CIF China(-1)  05-11|Dysprosium Oxide 99.5%min EXW China(60)  05-11|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered China(-3000)  05-11
  • Anglo American expects to resume operation at Moranbah North coal mine in May

    2021-05-10 13:05:45   [Print]
    Anglo American expects to resume operations at its Moranbah North coal mine in Australia in May after safety inspections and work on restoring systems.

    Operations at the mine, which produces coking coal used in steelmaking, were suspended in February after a coal heating issue that led to elevated gas readings underground.

    "It is expected that operations will restart during May," the compnay said in a statement.

    .Asian Metal Copyright Operations at the mine, which produces coking coal used in steelmaking, were suspended in February after a coal heating issue that led to elevated gas readings undergroundAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.