• Copper Conc. TC 25%min CIF China(-1)  05-17|Nickel Cathode Norilsk 99.96%min In port China(4300)  05-17|Indium Ingot 99.995%min Delivered Europe(8)  05-17|TMT Bar Fe500 16mm In warehouse Mumbai(1500)  05-17|Nickel Cathode 99.96%min EXW China(4300)  05-17|TMT Bar Fe500 12mm In warehouse Mumbai(1500)  05-17|Indium Ingot 99.995%min FOB China(10)  05-17|Rebar HRB400 20mm FOB China(15)  05-17|Wire Rod SAE1008 5.5mm In warehouse Mumbai(1500)  05-17|Wire Rod Q195 6.5mm FOB China(15)  05-17|Wire Rod SAE1008 6.5mm FOB China(15)  05-17|Rebar HRB400 12mm FOB China(15)  05-17|Indium Ingot 99.995%min Delivered US(7)  05-17|Cobalt Metal 99.8%min Delivered China(5)  05-17
  • China's first hydrogen reduction pig iron production line starts pilot run

    2021-04-14 17:13:09   [Print]
    After a 16-month construction period, China's first pig iron production line based on hydrogen-thermal reduction method started pilot run on April 20.Asian Metal CopyrightAfter a 16-month construction period, China's first pig iron production line based on hydrogen-thermal reduction method started pilot run on April 20.Asian Metal Copyright Inner Mongolia Saisipu Technology Co.Asian Metal Copyright Inner Mongolia Saisipu Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright invested RMB1.Asian Metal Copyright invested RMB1.Asian Metal CopyrightAfter a 16-month construction period, China's first pig iron production line based on hydrogen-thermal reduction method started pilot run on April 20.Asian Metal Copyright09 billion (USD167 million) in building the production line.
    .Asian Metal Copyright invested RMB1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.