• Copper Conc. TC 25%min CIF Chinadown(-3)  07-11|Polysilicon 9N Delivered Chinaup(2)  07-11|Silicon Metal 4-4-1 Delivered Chinaup(300)  07-11|Silicon Metal 4-2-1 Delivered Chinaup(300)  07-11|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Erbium Oxide 99.5%min EXW Chinaup(9)  07-11|Antimony Ingot 99.65%min In port Indiaup(140)  07-11|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  07-11|Iron Ore Fine Australian 62%min In port Chinaup(20)  07-11|Dysprosium Oxide 99.5%min EXW Chinaup(45)  07-11|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Iron Ore Fine Australian 62%min CNF Chinaup(2.5)  07-11|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-11|Rhenium APR 99.99%min EXW Chinaup(200)  07-11
  • Yunnan Tin Company puts tin smelting relocation upgrading and transformation project into pilot operation

    2020-11-26 11:25:35   [Print]
    On 25 November, Yunnan Tin Company Limited announced that its tin smelting relocation upgrading and transformation project (change) qualifies for pilot production now and will go into pilot operation on 26 November.

    According to the announcement, the second extraordinary general meeting of Yunnan Tin Company Limited in 2018 reviewed and approved the proposal on acquiring lead smelting related assets for tin smelting relocation upgrading and transformation project (change) and connected deals, approving the company to carry out the tin smelting relocation upgrading and transformation project (change) with a designed annual production capacity of 70,000 tons of tin products.

    The tin industry branch will act as the executor of tin smelting production and operation of Yunnan Tin Company Limited after the relocation. The company plans to shut down the smelting branch after the project records smooth operation, in order to avoid impacts on its tin smelting production resulted from the relocation upgrading and transformation.Asian Metal Copyright The transition from pilot production to full operation will take a period.Asian Metal Copyright The transition from pilot production to full operation will take a period.

    .Asian Metal CopyrightOn 25 November, Yunnan Tin Company Limited announced that its tin smelting relocation upgrading and transformation project change qualifies for pilot production now and will go into pilot operation on 26 NovemberAsian Metal Copyright
    Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW China
    Unit:RMB/kg
    Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW China RMB/kg
    China tin concentrate producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.