• Manganese Ore Gabonese 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Gabonese 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Australian 45%min In Qinzhou Port(3)  05-15|Manganese Ore Australian 45%min In Tianjin Port(3)  05-15|Copper Conc. TC 25%min CIF China(-1)  05-15|Antimony Trioxide 99.8%min Delivered China(3000)  05-15|Tungsten APT 88.5%min FOB China(10)  05-15|Lithium Carbonate 99.2%min Delivered China(-3000)  05-15|Lithium Carbonate 99.5%min Delivered China(-3000)  05-15|Tungsten Oxide WO3 99.95%min FOB China(10)  05-15|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-15|Lithium Manganate Mn 58% Delivered China(-1000)  05-15
  • Haicheng Hengsheng Casting preheats 1,350m3 blast furnace

    2020-11-06 11:12:28   [Print]
    On 1 November, 2020, Haicheng Hengsheng Casting began to preheat its 1,350m3 blast furnace constructed by China Metallurgical Construction Engineering Group, marking the start of the final stage of the construction.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.