• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Handan issues emergency emission reduction measures for heavy pollution weather

    2020-10-22 15:53:03   [Print]
    According to the Handan Ecological Environment Bureau, it is expected that severely polluted weather may occur in Handan from October 23 to 27.Asian Metal CopyrightAccording to the Handan Ecological Environment Bureau, it is expected that severely polluted weather may occur in Handan from October 23 to 27.Asian Metal Copyright The Municipal Emergency Response Headquarters for Heavy Pollution Weather decided to initiate Level Ⅲ emergency response from 12:00 on October 22 to 24:00 on October 24, and upgrade to Level Ⅱ emergency response from 0am on the 25th to 8:00am on the 28th.Asian Metal Copyright The coking industry in Handan will extend the coking time to 48 hours from October 22 to October 28, 2020, and the coking time of the gas supply enterprises involved in the people's livelihood Yuzhou, Xinsheng shall not be less than 36 hours.Asian Metal Copyright The city shall strictly follow the relevant requirements of emergency emission reduction and implement various emission reduction measures.

    From October 22 to October 28, 2020, Handan will implement the production load of blast furnaces in strict accordance with the Handan's Key Industry Production Control Plan in October-December of 2020. On the basis of the existing production control load, the control of sintering machines will be tightened to 50% of the production limit load.Asian Metal Copyright The city shall strictly follow the relevant requirements of emergency emission reduction and implement various emission reduction measures.Asian Metal Copyright All independent pellet plants ceased production during the period of strengthening management and control.

    The coking industry in Handan will extend the coking time to 48 hours from October 22 to October 28, 2020, and the coking time of the gas supply enterprises involved in the people's livelihood (Yuzhou, Xinsheng) shall not be less than 36 hours.

    From October 22 to October 28, 2020, the two thermal power companies of Handan Power and Matou Power strive to arrange maintenance of one unit under the conditions of ensuring safe production; other power companies strive to reduce their production load by more than 20%.

    .Asian Metal Copyright All independent pellet plants ceased production during the period of strengthening management and controlAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.