• Silico-manganese 65/17 EXW China(500)  05-08|Silico-manganese 60/14 EXW China(300)  05-08|Ammonium Metavanadate 98%min EXW China(3000)  05-08|Vanadium Pentoxide Powder 98%min EXW China(3000)  05-08|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  05-08|Manganese Ore Australian 45%min In Tianjin Port(1.8)  05-08|Manganese Ore Gabonese 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Gabonese 44%min In Tianjin Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Tianjin Port(1.7)  05-08|Manganese Ore S.A. 36%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 36%min In Tianjin Port(1.5)  05-08|Manganese Ore S.A. 37%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 37%min In Tianjin Port(1.5)  05-08
  • Lengshuijiang Steel achieves production at full capacity

    2020-04-17 15:51:13   [Print]
    In March, Lengshuijiang Steel Co.Asian Metal CopyrightIn March, Lengshuijiang Steel Co.Asian Metal Copyright, Ltd.Asian Metal CopyrightIn March, Lengshuijiang Steel Co.Asian Metal Copyright completed the production of 216,000 tons of pig iron, 216,000 tons of steel, 189,000 tons of steel products, and sold 186,000 tons of steel products.

    It is reported that in February, Lengshuijiang Steel completed the production of 205,000 tons of pig iron, 205,000 tons of steel, and 156,000 tons of steel products.

    On April 2, after the overhaul of a blast furnace and a high-speed wire production line was completed, the Lengshuijiang Steel increased its production, and each blast furnace and production line quickly entered full production. The company expects to produce 250,000 tons of pig iron, 250,000 tons of steel and 250,000 tons of steel products in April.

    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.