• Copper Conc. TC 25%min CIF China(-1)  05-17|Nickel Cathode Norilsk 99.96%min In port China(4300)  05-17|Indium Ingot 99.995%min Delivered Europe(8)  05-17|TMT Bar Fe500 16mm In warehouse Mumbai(1500)  05-17|Nickel Cathode 99.96%min EXW China(4300)  05-17|TMT Bar Fe500 12mm In warehouse Mumbai(1500)  05-17|Indium Ingot 99.995%min FOB China(10)  05-17|Rebar HRB400 20mm FOB China(15)  05-17|Wire Rod SAE1008 5.5mm In warehouse Mumbai(1500)  05-17|Wire Rod Q195 6.5mm FOB China(15)  05-17|Wire Rod SAE1008 6.5mm FOB China(15)  05-17|Rebar HRB400 12mm FOB China(15)  05-17|Indium Ingot 99.995%min Delivered US(7)  05-17|Cobalt Metal 99.8%min Delivered China(5)  05-17
  • Iron ore shipment via Jingmen-Shashi Railway in Q1 up by 22% YOY

    2020-04-08 13:36:41   [Print]
    Despite the impact of COVID-19, iron ore shipment via Jingmen-Shashi Railway reached 406,896 tonnes in the first quarter of 2020, up by 22% from 72,490 tonnes in the same period of last year, according to Jinzhou Local Railway Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.
    .Asian Metal CopyrightDespite the impact of COVID-19, iron ore shipment via Jingmen-Shashi Railway reached 406,896 tonnes in the first quarter of 2020, up by 22% from 72,490 tonnes in the same period of last year, according to Jinzhou Local Railway CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.