On February 14, Department of Industry and Information Technology of Hebei sought public opinions on the coking capacity transfer scheme for transformation and upgrading project of Hebei Lima Gas Co
.Asian Metal Copyright78m with 62 holes
160
Jan 2020
Dec 2021
1.
Asian Metal Copyright, Ltd.
Construction project
|
Company
|
Location
|
Facility
|
Capacity (10kt)
|
Proposed start time
|
Proposed operation time
|
Transfer ratio
|
Hebei Lima Gas Co., Ltd.
|
Fenghuangshan Industrial Group, Gaoyi District, Shijiazhuang South Industrial Park
|
2 samp charging ovens of 6.78m with 62 holes
|
160
|
Jan 2020
|
Dec 2021
|
1.25:1
|
Total
|
|
124 holes
|
160
|
|
|
|
Canceled project
|
No.
|
Province
|
Company
|
Facility
|
Capacity (10kt)
|
Demolition start time
|
Demolition end time
|
Note
|
1
|
Jingxing Mine, Shijiazhuang, Hebei
|
Hebei Changheng Energy Technology Co., Ltd.
|
2 samp charging ovens of 4.3m with 72 holes
|
81.6
|
Dec 2020
|
Dec 2020
|
|
2
|
Gaoyi County, Shijiazhuang, Hebei
|
Hebei Lima Gas Co., Ltd.
|
2 samp charging ovens of 4.3m with 60 holes
|
68
|
Dec 2020
|
Dec 2020
|
|
3
|
Gaocheng District, Shijiazhuang, Hebei
|
Shijiazhuang Gaocheng Jinxin Coking Co., Ltd.
|
2 samp charging ovens of 4.3m with 43 holes
|
51
|
Dec 2020
|
Dec 2020
|
|
Total
|
|
350 holes
|
200.6
|
|
|
|
.Asian Metal Copyright
Fenghuangshan Industrial Group, Gaoyi District, Shijiazhuang South Industrial Park
2 samp charging ovens of 6Asian Metal Copyright