• Silicon Metal 5-5-3 Delivered China(-2000)  10-21|Thermal Coal Q:5000 In port Qinhuangdao(50)  10-21|Silicon Metal 5-5-3 Ex-VAT FOB China(-300)  10-21|Thermal Coal Q:5500 In port Qinhuangdao(50)  10-21|Silicon Metal 5-5-3 FOB China(-300)  10-21|Ferro-silicon 75%min In warehouse Pittsburgh(0.1)  10-21|Manganese Flake 99.7%min FOB China(200)  10-21|Manganese Briquette 97%min FOB China(200)  10-21|Tin Conc. 60%min Delivered China(7900)  10-21|Manganese Lump 96.5%min FOB China(200)  10-21|Tin Ingot 99.9%min EXW China(8500)  10-21|Silicon Metal 3-3-03 P 50ppm max Ex-VAT FOB China(-300)  10-21|Nickel Cathode Norilsk 99.96%min In port China(4400)  10-21|Manganese Flake 99.7%min CIF India(200)  10-21
  • Jiangxi: Cancel production resumption approval process and launches filing mode

    2020-02-18 17:40:17   【Print】
    On 16 February, 2020, Novel Coronavirus Prevention and Control Emergency Operations Center of Jiangxi Province released a notice, according to which local authorities are required to strengthen epidemic prevention and control guidance and supervision on enterprises resuming production, and production resumption approval process for enterprises and construction projects is cancelled and changed into filing mode.Asian Metal CopyrightOn 16 February, 2020, Novel Coronavirus Prevention and Control Emergency Operations Center of Jiangxi Province released a notice, according to which local authorities are required to strengthen epidemic prevention and control guidance and supervision on enterprises resuming production, and production resumption approval process for enterprises and construction projects is cancelled and changed into filing mode.Asian Metal Copyright Enterprises and project construction bodies only need to submit epidemic prevention and control programs to local authorities 24 hours in advance.Asian Metal Copyright .Asian Metal Copyright Those located in the industrial park are required to submit programs to the industrial park while those located outside the industrial park are required to submit programs to industry authorities, effective from zero hour of 17 February, 2020.
    .Asian Metal CopyrightOn 16 February, 2020, Novel Coronavirus Prevention and Control Emergency Operations Center of Jiangxi Province released a notice, according to which local authorities are required to strengthen epidemic prevention and control guidance and supervision on enterprises resuming production, and production resumption approval process for enterprises and construction projects is cancelled and changed into filing mode.Asian Metal Copyright
      Copyright © Asian Metal Corp. All rights reserved.