Projects in construction
|
Company
|
Construction site
|
Smelting equipment (name, type and quantity)
|
Production capacity (10kt)
|
Construction starts in
|
Production starts in
|
Replacement ratio
|
Shanxi Yongheng Industrial Trade Co., Ltd.
|
Xishe village, Xishe Town, Jishan County, Yuncheng City, Shanxi Province
|
1×1230m3 iron smelting blast furnace
|
114.2
|
Dec 2021
|
Dec 2023
|
1.01:1
|
Shanxi Yongheng Industrial Trade Co., Ltd.
|
Xishe village, Xishe Town, Jishan County, Yuncheng City, Shanxi Province
|
1×130t steel smelting rotary furnace
|
143.3
|
Dec 2021
|
Dec 2023
|
1.01:1
|
Projects closed
|
No.
|
Province (district, city)
|
Company
|
Smelting equipment (name, type and quantity)
|
Production capacity (10kt)
|
Dismantling starting date
|
Dismantling finish date
|
Remarks
|
1
|
Yuncheng
|
Shanxi Yongheng Industrial Trade Co., Ltd.
|
2×450m3 iron smelting blast furnaces
|
110
|
Three months ahead of the operation of new 1,230m3 furnace
|
Before the operation of new 1,230m3 furnace
|
Capacity reduced by 12,500t at the ratio of 1.01:1
|
Jinzhong
|
Shanxi Xintai Iron and Steel Co., Ltd.
|
1×1860m3 iron smelting blast furnace capacity to replace the remaining project capacity
|
5.45
|
2
|
Yuncheng
|
Shanxi Yongheng Industrial Trade Co., Ltd.
|
2×50t steel smelting rotary furnaces
|
152
|
Three months ahead of the operation of new 130t rotary furnace
|
Before the operation of new 130t rotary furnace
|
Capacity should be reduced by 17,000t at the ratio of 1.01:1; the remaining 70,000t of steel capacity to be used for other replacement project.
|