• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Jincheng issues 2019-2020 autumn/winter comprehensive air pollution control action plan

    2019-10-30 17:40:52   [Print]
    Jincheng government recently issued an action plan on the comprehensive air pollution control for autumn and winter 2019-2020.

    The plan calls for a structure adjustment in heavy-pollution industry. By the end of December 2019, five casting companies are required to complete relocation to new sites; coal production capacity of 2.Asian Metal Copyright Other requirements include a comprehensive control on air pollution from industrial furnaces and kilns, a faster construction of special railway line, as well as a substantial increase in cargo volume by rail.Asian Metal Copyright85 million tonnes per year should be reduced; coking capacity of 400,000tpy should be cut according to another action plan released by Shanxi government; a detailed action plan on cutting down excessive coking capacity in Jincheng should also be made.

    The plan also promotes the upgrade of traditional industrial clusters, including casting, refractory, ferroalloy, carbon, coal washing and so on. Relevant industries shall set concrete goals for the upgrade.

    In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standards. A policy incentive mechanism will be set for companies that meet the standards after assessment.

    Other requirements include a comprehensive control on air pollution from industrial furnaces and kilns, a faster construction of special railway line, as well as a substantial increase in cargo volume by rail.

    .Asian Metal Copyright85 million tonnes per year should be reduced; coking capacity of 400,000tpy should be cut according to another action plan released by Shanxi government; a detailed action plan on cutting down excessive coking capacity in Jincheng should also be madeAsian Metal Copyright
    Aluminum Scrap Plate Scrap Al 91%min Ex-VAT Delivered China
    Unit:RMB/mt
    China bauxite producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.