• Erbium Oxide 99.5%min EXW China(9)  04-29|Copper Conc. TC 25%min CIF China(-1)  04-29|Selenium Powder 99.9%min Delivered India(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-29|Arsenic Metal 99.9999%min Delivered China(-7)  04-29|Silicon Metal 98.5%min Delivered US(0.04)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-29|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-29|Zinc Conc. TC 50% CIF China(-1.5)  04-29|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdam(-0.04)  04-29|Ferro-tungsten 75%min In warehouse Rotterdam(1)  04-29|Ferro-tungsten 75%min FOB Russia(1)  04-29
  • Hebei Yongyang Special-steel to start construction of high-quality light rail production line

    2019-06-04 16:59:17   [Print]
    On 28 May, MCC Tiangong Group won the bidding of Hebei Yongyang Special-steel Group and will construct the high-quality light rail production line project, an equipment upgrading project of industrial restructuring and relocation.Asian Metal CopyrightOn 28 May, MCC Tiangong Group won the bidding of Hebei Yongyang Special-steel Group and will construct the high-quality light rail production line project, an equipment upgrading project of industrial restructuring and relocation.Asian Metal Copyright Located in the new area of Yongyang Special-steel Group in Yongnian district, Handan, Hebei, the project is expected to produce 600,000 tons of light rail rolling line per annum.Asian Metal Copyright Located in the new area of Yongyang Special-steel Group in Yongnian district, Handan, Hebei, the project is expected to produce 600,000 tons of light rail rolling line per annum.Asian Metal Copyright Covering construction and installation of light rail rolling line, structures and public facilities, the construction period will be 12 months in total.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.