• Copper Cathode 99.99%min Delivered China(4300)  05-20|Copper Conc. 20%min Delivered China(4000)  05-20|Copper Scrap Wire 99%min Delivered China(4000)  05-20|Copper Conc. TC 25%min CIF China(-1)  05-20|Antimony Ingot 99.65%min EXW China(4500)  05-20|Antimony Ingot 99.85%min EXW China(4500)  05-20|Antimony Conc. 50%min Delivered China(3500)  05-20|Antimony Trioxide 99.5%min Delivered China(3500)  05-20|Antimony Trioxide 99.8%min Delivered China(3500)  05-20|Tin Conc. Burmese 20%min In warehouse MengA(7000)  05-20|Indium Ingot 99.995%min Delivered US(8)  05-20|Nickel Cathode 99.96%min EXW China(4500)  05-20|Nickel Cathode Norilsk 99.96%min In port China(4400)  05-20|Tin Conc. Burmese 30%min In warehouse MengA(7000)  05-20
  • PV project of RMB200 million of total investment goes to Zhuozi

    2017-04-20 17:01:17   [Print]
    Zhao Temple Lama Kongdai Pingdingshan’s PV project of Zhuozi County Luyang New Energy Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright The PV project is divided into two phases, which will join the power grid in late this year, expecting the annual output value to reach RMB30 million USD4.Asian Metal Copyright got the total investment of RMB200 million (USD29.Asian Metal Copyright After the project is completed, it can optimize the energy structure of Zhuozi, protect the environment, and promote the sustainable development of energy and economy and society, to promote the development of Zhuozi’s economy.Asian Metal Copyright05 million) with the construction of 20,000kw subdivided into two phases: 10,000kw for each phase.Asian Metal CopyrightZhao Temple Lama Kongdai Pingdingshan’s PV project of Zhuozi County Luyang New Energy Co.Asian Metal Copyright On 11st of April, the foundation stone laying ceremony of the project was held in zhao Temple administrative village, Bayinxile town, Zhuozi county.

    Founded on 17th November, 2015, Zhuozi County Luyang New Energy Co., Ltd.Asian Metal Copyright On 11st of April, the foundation stone laying ceremony of the project was held in zhao Temple administrative village, Bayinxile town, Zhuozi county.Asian Metal Copyright is mainly engaged in investment, operation, services and other businesses of solar power generation.

    The PV project is divided into two phases, which will join the power grid in late this year, expecting the annual output value to reach RMB30 million (USD4.36 million) and turning in RMB200,000 (USD29,048) of profits and taxes.Asian Metal Copyright After the project is completed, it can optimize the energy structure of Zhuozi, protect the environment, and promote the sustainable development of energy and economy and society, to promote the development of Zhuozi’s economy.Asian Metal Copyright After the project is completed, it can optimize the energy structure of Zhuozi, protect the environment, and promote the sustainable development of energy and economy and society, to promote the development of Zhuozi’s economy.

    .Asian Metal CopyrightZhao Temple Lama Kongdai Pingdingshan’s PV project of Zhuozi County Luyang New Energy CoAsian Metal Copyright
    Polysilicon 6N Delivered China
    Unit:RMB/kg
    China silicon metal producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.