• Copper Conc. 25%min CIF China TCdown(-10)  08-12|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(20)  08-12|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinaup(20)  08-12|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinaup(20)  08-12|Ferro-molybdenum 60%min IW Russiaup(90)  08-12|Antimony Trioxide 99.8%min Delivered Chinaup(2500)  08-12|Erbium Oxide 99.5%min FOB Chinaup(2.5)  08-12|Antimony Ingot 99.65%min EXW Chinaup(2500)  08-12|Erbium Oxide 99.5%min IW Rotterdamup(2.5)  08-12|Antimony Ingot 99.85%min EXW Chinaup(2500)  08-12|Tungsten Ore WO3 50%min FOB Africaup(50)  08-12|Ferro-gadolinium 73% EXW Chinadown(-5000)  08-12|Gadolinium Oxide 99.5%min EXW Chinadown(-5000)  08-12|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(150)  08-12
  • Zhongke Xicai receives approval for rare earth metal project

    2026-05-20 15:48:11   [Print]
    Zhongke Xicai Rare Earth Alloy (Inner Mongolia) Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright The project will be located in the central section of the Baotou Bayan Obo Industrial Park Rare Earth New Materials Industrial Park.Asian Metal Copyright has received the initial approval from the Department of Industry and Information Technology of Inner Mongolia Autonomous Region to build a 5,000tpa rare earth metal project.

    The project will be located in the central section of the Baotou Bayan Obo Industrial Park (Rare Earth New Materials Industrial Park). It is designed to produce 5,000 tonnes of rare earth metals annually, including 500 tonnes of PrNd metal, 2,000 tonnes of LaCe metal, 1,500 tonnes of cerium metal and 1,000 tonnes of lanthanum metal.

    Construction will involve using the company's leased production workshops, auxiliary buildings and office facilities to build a 5,000 tpa rare earth metal production line along with supporting utilities and infrastructure.

    The total investment is RMB46.93 million (USD6.Asian Metal Copyright The total investment is RMB46.Asian Metal Copyright89 million), all of which will be funded by the company itself.Asian Metal Copyright The construction period is set at 24 months.Asian Metal Copyright The construction period is set at 24 months.
    .Asian Metal Copyright The project will be located in the central section of the Baotou Bayan Obo Industrial Park Rare Earth New Materials Industrial ParkAsian Metal Copyright
    Cerium Metal 99%min EXW China
    Unit:RMB/mt
    Cerium Metal 99%min EXW China RMB/mt
    China cerium metal producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.