• Mercury Metal 99.9%min Ex-VAT EXW Chinadown(-110)  06-10|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-2000)  06-10|Monazite TREO 54%min In port Chinadown(-1700)  06-10|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(200)  06-10|Tin Conc. Burmese 20%min IW MengAdown(-10000)  06-10|Tin Conc. Burmese 30%min IW MengAdown(-10000)  06-10|Germanium Dioxide 99.99%min EXW Chinaup(400)  06-10|Ferro-tungsten 75%min FOB Chinaup(5)  06-10|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(40)  06-10|Tin Conc. 60%min Delivered Chinadown(-10000)  06-10|Tin Ingot 99.95%min EXW Chinadown(-10000)  06-10|Ferro-tungsten 75%min EXW Chinaup(20000)  06-10|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(15)  06-10|Germanium Metal 99.99%min EXW Chinaup(500)  06-10
  • MIIT issues revised steel capacity swap implementation rules

    2026-05-19 15:01:57   [Print]
    China's Ministry of Industry and Information Technology (MIIT) has issued revised rules on capacity replacement for the steel sector, further tightening requirements to curb overcapacity and promote high-quality development.

    Key revisions include:

    Higher replacement ratios. Nationwide, both ironmaking and steelmaking capacity replacement ratios must be no less than 1.Asian Metal Copyright Key revisions include: Higher replacement ratios.Asian Metal Copyright5:1.Asian Metal Copyright Phase-out of inter-company capacity swaps.Asian Metal Copyright For mergers and acquisitions, the ratio has been raised to no less than 1.Asian Metal Copyright Phase-out of inter-company capacity swaps.Asian Metal Copyright25:1.

    Phase-out of inter-company capacity swaps. A two-year transition period will be in place for capacity transfers between different companies.Asian Metal Copyright After this period, capacity can only be transferred through substantive mergers and acquisitions.Asian Metal Copyright After this period, capacity can only be transferred through substantive mergers and acquisitions.

    Validity period. Capacity replacement plans will now have a validity period of 24 months.
    .Asian Metal Copyright After this period, capacity can only be transferred through substantive mergers and acquisitionsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.