• LNCMO 523 SC Delivered Chinadown(-10)  06-12|Tin Conc. Burmese 20%min IW MengAup(11000)  06-12|Tin Conc. Burmese 30%min IW MengAup(11000)  06-12|Tungsten APT 88.5%min FOB Chinaup(50)  06-12|Tungsten Oxide WO3 99.95%min EXW Chinaup(25000)  06-12|Tin Conc. 60%min Delivered Chinaup(11000)  06-12|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinaup(20)  06-12|Tungsten Oxide WO3 99.95%min FOB Chinaup(50)  06-12|Tin Ingot 99.95%min EXW Chinaup(11000)  06-12|Tin Solder Wire 99.3%min EXW Chinaup(11)  06-12|Tin Solder Bar 60%min EXW Chinaup(7)  06-12|Monazite TREO 54%min In port Chinadown(-1500)  06-12|Selenium Dioxide 98%min Delivered Chinadown(-4)  06-12|Vanadium Pentoxide Flake 98%min EXW Chinadown(-2000)  06-12
  • Tianyi Mining to build lithium ore processing project in Xinjiang

    2026-03-04 15:44:48   [Print]
    Yecheng Tianyi Mining Co.Asian Metal Copyright88 million, of which RMB5.Asian Metal Copyright, Ltd.Asian Metal Copyright69% of the total.Asian Metal Copyright plans to build a polymetallic ore flotation project in Yecheng County Industrial Park in Xinjiang, designed to process 1 million tones per year of polymetallic ore, including lithium, lead, zinc, and silver, according to the environmental impact assessment (EIA) released by local authorities for public review.

    Total planned investment for the project is RMB200 million (USD28.88 million), of which RMB5.Asian Metal Copyright Once fully operational, it will produce 154,300 tonnes per year of lithium concentrate, which will be directly supplied to downstream smelters.Asian Metal Copyright38 million (USD0.Asian Metal Copyright plans to build a polymetallic ore flotation project in Yecheng County Industrial Park in Xinjiang, designed to process 1 million tones per year of polymetallic ore, including lithium, lead, zinc, and silver, according to the environmental impact assessment EIA released by local authorities for public review.Asian Metal Copyright8 million) is for environmental protection, accounting for 2.Asian Metal Copyright, Ltd.Asian Metal Copyright69% of the total.Asian Metal Copyright Once fully operational, it will produce 154,300 tonnes per year of lithium concentrate, which will be directly supplied to downstream smelters.Asian Metal Copyright This EIA specifically covers the Phase I lithium beneficiation facility.

    The Phase I project will process 412,5000 tonnes of spodumene raw ore and 412,500 tonnes of externally sourced lithium heavy-medium concentrate annually. Once fully operational, it will produce 154,300 tonnes per year of lithium concentrate, which will be directly supplied to downstream smelters.Asian Metal Copyright .Asian Metal Copyright Raw materials are clearly sourced, with lithium ore from the Huoshaoyun–Dahongliutatan lead-zinc-lithium resources base and heavy-medium concentrate supplied by Xinjiang Kunlun Blue Diamond Mining Development Co.Asian Metal Copyright Once fully operational, it will produce 154,300 tonnes per year of lithium concentrate, which will be directly supplied to downstream smelters.Asian Metal Copyright, Ltd.

    .Asian Metal Copyright, LtdAsian Metal Copyright
    Spodumene Li2O 5%min In port China
    Unit:RMB/dmtu
    Spodumene Li2O 5%min In port China RMB/dmtu
    China lithium cobaltate producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.