• Lanthanum Oxide 99.9%min EXW Chinaup(150)  04-10|Aluminum Fluoride 61%min EXW Chinaup(300)  04-10|Germanium Dioxide 99.99%min EXW Chinaup(300)  04-10|Tungsten APT 88.5%min IW Rotterdamup(70)  04-10|Ionic RE Conc. TREO 92%min In port Chinadown(-5000)  04-10|LaCe Carbonate TREO 45%min, CeO2/REO 65±2% EXW Chinaup(50)  04-10|Germanium Metal 99.99%min EXW Chinaup(400)  04-10|Lanthanum Oxide 99.999%min EXW Chinaup(800)  04-10|Aluminum Fluoride 61%min FOB Chinaup(40)  04-10|Yttrium Oxide 99.999%min IW Rotterdamup(10)  04-10|Lanthanum Oxide 99.999%min FOB Chinaup(0.15)  04-10|Tin Conc. Burmese 20%min IW MengAup(8000)  04-10|Tin Conc. Burmese 30%min IW MengAup(8000)  04-10|Manganese Ore Gabonese 44%min In Qinzhou Portdown(-1)  04-10
  • Dahao Mining receives approval to build Xiaodong Antimony Project in Yunnan

    2026-02-26 16:15:28   [Print]
    The Xichou County Xiaodong antimony mining and processing project developed by Wenshan Dahao Mining Development Co.Asian Metal Copyright13%.Asian Metal Copyright, Ltd.Asian Metal Copyright56% Sb on average, and inferred resources of 602,000 tonnes, amounting to 16,562 tonnes of antimony.Asian Metal Copyright, a majority-owned subsidiary of BGT Group, has been approved by Yunnan Development and Reform Commission.

    The project will build a new underground mine with a designed mining capacity of 90,000 tonnes per year. Construction is expected to take two years, with a mine life of 12 years.Asian Metal Copyright The deposit has identified resources of 1.Asian Metal Copyright The project will produce antimony concentrate and involves a total planned investment of about RMB294 million (USD43.Asian Metal Copyright, a majority-owned subsidiary of BGT Group, has been approved by Yunnan Development and Reform Commission.Asian Metal Copyright01 million).

    The mining license for Xiaodong antimony mine is valid until July 3, 2034. The deposit has identified resources of 1.Asian Metal Copyright The mining license for Xiaodong antimony mine is valid until July 3, 2034.Asian Metal Copyright115 million tonnes of antimony ore, containing 34,900 tonnes of antimony with an average grade of 3.Asian Metal Copyright Construction is expected to take two years, with a mine life of 12 years.Asian Metal Copyright13%.Asian Metal Copyright This included measured resources of 155,000 tonnes, containing 5,608 tonnes of antimony at 3.Asian Metal Copyright This included measured resources of 155,000 tonnes, containing 5,608 tonnes of antimony at 3.Asian Metal Copyright115 million tonnes of antimony ore, containing 34,900 tonnes of antimony with an average grade of 3.Asian Metal Copyright62% Sb on average, indicated resources of 358,000 tonnes, containing 12,730 tonnes of antimony at 3.Asian Metal Copyright56% Sb on average, and inferred resources of 602,000 tonnes, amounting to 16,562 tonnes of antimony.Asian Metal Copyright56% Sb on average, and inferred resources of 602,000 tonnes, amounting to 16,562 tonnes of antimony.

    .Asian Metal Copyright This included measured resources of 155,000 tonnes, containing 5,608 tonnes of antimony at 3Asian Metal Copyright
    Antimony Conc. 50%min Delivered China
    Unit:RMB/mt Sb
    Antimony Conc. 50%min Delivered China RMB/mt Sb
    China antimony concentrate produders' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.