• Cobalt Metal 99.8%min Delivered Chinaup(10)  10-10|Cobalt Sulfate 20.5%min Delivered Chinaup(2000)  10-10|Cobalt Metal 99.8%min In warehouse Rotterdamup(0.5)  10-10|Cobalt Tetroxide 73.5%min Delivered Chinaup(7)  10-10|Tin Conc. 60%min Delivered Chinaup(8000)  10-10|Tin Ingot 99.95%min EXW Chinaup(8000)  10-10|Tin Conc. Burmese 20%min In warehouse MengAup(7000)  10-10|Tin Conc. Burmese 30%min In warehouse MengAup(7000)  10-10|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(8)  10-10|LNCMO 8312 PC Delivered Chinaup(4)  10-10|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(5)  10-10|Cobalt Powder 99.5%min Delivered Chinaup(10)  10-10|Cobalt Oxide 72%min Delivered Chinaup(6)  10-10|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(8)  10-10
  • AsianMetal
    Events & Holidays
    event

    Monthly Section Steel and Steel Pipe Market Report Sep 2025

    2025-10-09 08:27:58   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    1. Market Highlights

    The domestic section steel and steel pipe market performance improved a little in the first half of the month, but turned to unsatisfactory again in the second half. End users strictly purchased from hand to mouth dragged by the insufficient orders.Asian Metal Copyright The demand from downstream industries kept soft.Asian Metal Copyright The demand from downstream industries kept soft.

    .Asian Metal Copyright Market Highlights The domestic section steel and steel pipe market performance improved a little in the first half of the month, but turned to unsatisfactory again in the second halfAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.