• Yttrium Oxide 99.999%min In warehouse Rotterdamup(25)  12-05|Zinc Conc. TC 50%min CIF Chinadown(-5)  12-05|Selenium Dioxide 98%min Delivered Chinadown(-4)  12-05|Antimony Trioxide 99.5%min In warehouse Baltimoredown(-0.8)  12-05|Calcined Pet Coke S 3%max EXW Chinaup(100)  12-05|Antimony Ingot 99.65%min In warehouse Baltimoredown(-0.7)  12-05|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1)  12-05|Rebar HRB400 20mm In warehouse Shanghaiup(80)  12-05|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  12-05|Manganese Ore Brazilian 44%min In Tianjin Portup(1)  12-05|Manganese Ore Gabonese 44%min In Tianjin Portup(1)  12-05|Manganese Ore Australian 45%min In Tianjin Portup(1)  12-05|Antimony Ingot 99.65%min In port Indiadown(-100)  12-05|Ferro-vanadium 50%min In warehouse Russiaup(20)  12-05
  • Sinomag to expand wet-pressed ferrite magnet capacity in Vietnam

    2025-09-16 16:44:25   [Print]
    Anhui Sinomag Technology announced that its wholly-owned subsidiary, Sinomag Technology (Vietnam) Co.Asian Metal Copyright Construction is scheduled to begin in September 2025 and proceed in two stages over a 36-month period.Asian Metal Copyright, Ltd.Asian Metal Copyright The project will add annual production capacity of 10,000 tonnes of wet-pressed permanent ferrite arc magnets and 25,000 tonnes of pre-calcined ferrite materials, supporting capacity expansion and local raw material supply.Asian Metal Copyright, plans to invest about RMB210 million (USD29.Asian Metal Copyright The Phase II project will be located in the Longjiang Industrial Park, Tan Lap 1 Commune, Tan Phuoc District, Tien Giang Province, Vietnam.Asian Metal Copyright5 million) in a second-phase project to expand overseas permanent magnet capacity.Asian Metal Copyright .Asian Metal Copyright The project will add annual production capacity of 10,000 tonnes of wet-pressed permanent ferrite arc magnets and 25,000 tonnes of pre-calcined ferrite materials, supporting capacity expansion and local raw material supply.

    The Phase II project will be located in the Longjiang Industrial Park, Tan Lap 1 Commune, Tan Phuoc District, Tien Giang Province, Vietnam. Construction is scheduled to begin in September 2025 and proceed in two stages over a 36-month period.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.