• Met. Coke A 13%max, S 0.7%max EXW Shanxidown(-50)  08-01|Met. Coke A 13%max, S 0.7%max EXW Hebeidown(-50)  08-01|Met. Coke A 13%max, S 0.7%max EXW Shandongdown(-50)  08-01|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-01|Spodumene Li2O 5%min In port Chinadown(-30)  08-01|Germanium Metal 99.99%min Delivered Europeup(100)  08-01|Cerium Oxide 99%min FOB Chinadown(-50)  08-01|Germanium Metal 99.99%min Delivered USup(100)  08-01|Ilmenite Conc TiO2 46%min Ex-VAT EXW Chinadown(-50)  08-01|Spodumene Li2O 6%min CIF Chinadown(-20)  08-01|Ferro-silicon 75%min In warehouse Rotterdamup(30)  08-01|Cobalt Intermediate 30-40% CIF Chinaup(0.3)  08-01|Spodumene Li2O 3%min In port Chinadown(-20)  08-01|Cobalt Metal 99.8%min Delivered Chinaup(6)  08-01
  • Liaoning Huaxiang to launch zirconium-hafnium separation project

    2025-07-29 14:29:58   [Print]
    Liaoning Huaxiang New Materials Co.Asian Metal Copyright Construction, including a new extraction facility and supporting infrastructure, is expected to take around 15 months.Asian Metal Copyright, Ltd.Asian Metal CopyrightLiaoning Huaxiang New Materials Co.Asian Metal Copyright, a subsidiary of Sanxiang Advanced Materials Co.Asian Metal Copyright81 million in a zirconium-hafnium separation project with an annual capacity of 20,000 tonnes.Asian Metal Copyright, Ltd.Asian Metal Copyright Located within its existing plant, the project will build on the current zirconium oxychloride production line to produce nuclear-grade zirconium oxychloride and hafnium oxychloride.Asian Metal Copyright, plans to invest up to RMB300 million (USD41.Asian Metal CopyrightLiaoning Huaxiang New Materials Co.Asian Metal Copyright81 million) in a zirconium-hafnium separation project with an annual capacity of 20,000 tonnes.Asian Metal Copyright, a subsidiary of Sanxiang Advanced Materials Co.Asian Metal Copyright Located within its existing plant, the project will build on the current zirconium oxychloride production line to produce nuclear-grade zirconium oxychloride and hafnium oxychloride.Asian Metal Copyright .Asian Metal Copyright Construction, including a new extraction facility and supporting infrastructure, is expected to take around 15 months.

    The project will be developed in phases. Once completed, it will add annual production capacity of over 250 tonnes of hafnium oxychloride, 11,740 tonnes of ultra-high-purity zirconium oxychloride, and 8,000 tonnes of nuclear-grade zirconium oxychloride.Asian Metal Copyright81 million in a zirconium-hafnium separation project with an annual capacity of 20,000 tonnes.Asian Metal Copyright It is expected to help ease raw material shortages in nuclear energy, semiconductor precursors, and high-temperature alloy sectors.


    .Asian Metal Copyright, plans to invest up to RMB300 million USD41Asian Metal Copyright
    Zirconium Sponge Zr+Hf 99.4%min EXW China
    Unit:RMB/kg
    Zirconium Sponge Zr+Hf 99.4%min EXW China RMB/kg
    China zirconium oxychloride producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.