• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Tengyuan Cobalt plans JV for copper-cobalt smelter in DRC

    2025-04-21 16:08:39   [Print]
    Tengyuan Cobalt has announced a plan to invest in a new smelter project in the Democratic Republic of the Congo (DRC) through a joint venture.Asian Metal Copyright The total planned investment for the project is RMB980 million 135 million, with a construction period of 18 months.Asian Metal Copyright To further secure raw material supply for its domestic cobalt refining operations following production expansion, and in line with the company's 2022–2026 development strategy, its wholly owned subsidiary, Tengyuan New Materials (Hong Kong) Investment Holding Co.Asian Metal Copyright The plan includes acquiring new land in the DRC and constructing a hydrometallurgical plant with an annual production capacity of 30,000 tonnes of copper and 2,000 tonnes of cobalt.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright, will partner with KENVISTA INVESTMENTS LIMITED ("Hong Kong Kenvista") to establish a joint venture company in Hong Kong.

    Through this Hong Kong joint venture, the two parties plan to set up a project operating company in the DRC to collaborate on a copper mining project. The plan includes acquiring new land in the DRC and constructing a hydrometallurgical plant with an annual production capacity of 30,000 tonnes of copper and 2,000 tonnes of cobalt.Asian Metal Copyright The total planned investment for the project is RMB980 million 135 million, with a construction period of 18 months.Asian Metal Copyright The total planned investment for the project is RMB980 million (135 million), with a construction period of 18 months.

    .Asian Metal Copyright Through this Hong Kong joint venture, the two parties plan to set up a project operating company in the DRC to collaborate on a copper mining projectAsian Metal Copyright
    Copper Conc. TC 25%min CIF China
    Unit:USD/mt
    Copper Conc. TC 25%min CIF China USD/mt
    China refined copper producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.