• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Guizhou Jiashang more than doubles LMO production capacity

    2024-12-23 14:24:17   [Print]
    Guizhou Jiashang New Energy Material Co.Asian Metal CopyrightGuizhou Jiashang New Energy Material Co.Asian Metal Copyright, Ltd.Asian Metal Copyright currently has four lithium manganese oxide LMO production lines in operation, which produced 5,540t of LMO since commencing production in June 2024, achieving production value of RMB175 million USD23.Asian Metal Copyright currently has four lithium manganese oxide (LMO) production lines in operation, which produced 5,540t of LMO since commencing production in June 2024, achieving production value of RMB175 million (USD23.Asian Metal Copyright5 billion 343 million, the project has a planned land area of more than 400Mu 26.Asian Metal Copyright98 million).

    The company's 100-meter LMO cathode material tunnel kiln production line is so far the longest one of its kind in the world. The four operating production lines are fully automatic, with production capacity more than doubling to 50,000tpa from the original 20,000tpa.

    Guizhou Jiashang is a subsidiary of Guangdong Jiashang New Energy Technology Co., Ltd.Asian Metal Copyright67 hectares and will build production lines and associated facilities with annual production capacity of 100,000t of LMO, 40,000t of ternary cathode material, 10,000t of lithium cobalt oxides LCO cathode material, and 100,000t of lithium iron phosphate LFP cathode material.Asian Metal Copyright With a total investment of RMB2.Asian Metal Copyright, Ltd.Asian Metal Copyright5 billion (343 million), the project has a planned land area of more than 400Mu (26.Asian Metal Copyright37 billion.Asian Metal Copyright67 hectares) and will build production lines and associated facilities with annual production capacity of 100,000t of LMO, 40,000t of ternary cathode material, 10,000t of lithium cobalt oxides (LCO) cathode material, and 100,000t of lithium iron phosphate (LFP) cathode material.Asian Metal Copyright With a total investment of RMB2.Asian Metal Copyright The first phase of the project will build eight production lines in total, with four lines already completed.Asian Metal Copyright The second phase has completed plant construction, and when fully operational, it is expected to realize annual production value of RMB10 billion USD1.Asian Metal Copyright The second phase has completed plant construction, and when fully operational, it is expected to realize annual production value of RMB10 billion (USD1.Asian Metal Copyright The first phase of the project will build eight production lines in total, with four lines already completed.Asian Metal Copyright37 billion).


    .Asian Metal CopyrightGuizhou Jiashang New Energy Material CoAsian Metal Copyright
    Lithium Manganate Mn 58% Delivered China
    Unit:RMB/mt
    Lithium Manganate Mn 58% Delivered China RMB/mt
    China's lithium maganate producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.