Tianzheng Energy breaks ground on phase two of graphite anode project
2024-08-06 15:02:52 [Print]
On August 3, construction kicked off for the phase two of a lithium battery graphite anode production and graphene R&D project developed by Jiangxi Tianzheng Energy Technology Co
The second phase of the project is located in Huichang, Ganzhou, with a total land area of around 113,400 sq.m and floor area of approximately 136,208 sq . m . When reaching full capacity, the phase two is capable of producing 30,000 tonnes per annum of graphite anode material for lithium battery, with an annual operating revenue of more than RMB1 billion (USD140 million), and is expected to help create nearly 200 local jobs.
. , Ltd. The second phase of the project is located in Huichang, Ganzhou, with a total land area of around 113,400 sq.m and floor area of approximately 136,208 sq . m . When reaching full capacity, the phase two is capable of producing 30,000 tonnes per annum of graphite anode material for lithium battery, with an annual operating revenue of more than RMB1 billion (USD140 million), and is expected to help create nearly 200 local jobs.