• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Houying Haicheng to replace 2.3Mtpa steel capacity

    2024-08-01 15:41:45   [Print]
    Houying Group Haicheng Iron and Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright plans to build two 100-ton rotary furnaces with total steelmaking capacity of 2.Asian Metal Copyright3Mtpa under a capacity replacement scheme where 2.Asian Metal Copyright3Mtpa under a capacity replacement scheme where 2.Asian Metal Copyright .Asian Metal Copyright6Mtpa of steel capacity would be shut down, according to a notice issued by the Department of Industry and Information Technology of Liaoning Province.

    The new furnaces are expected to become operational in January 2026 after the existing ones for replacement are completely dismantled by December 2025.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.