• Copper Conc. TC 25%min CIF China(-1)  06-14|Coal Tar Pitch Coking Value 53%min EXW China(-140)  06-14|Chrome Lump 40%min FOB Turkey(9)  06-14|Silicon Metal 98.5%min Delivered US(0.05)  06-14|Manganese Ore S.A. 36%min In Qinzhou Port(-1.5)  06-14|Manganese Ore S.A. 36%min In Tianjin Port(-1.5)  06-14|Manganese Ore S.A. 37%min In Qinzhou Port(-1.4)  06-14|Manganese Ore S.A. 37%min In Tianjin Port(-1.4)  06-14|Ferro-gadolinium Gd 73% EXW China(-4000)  06-14|Zinc Conc. TC 50% CIF China(-0.6)  06-14|Amorphous Graphite 80%min 20-50mm EXW China(50)  06-14|Amorphous Graphite 80%min 200mesh min EXW China(50)  06-14|Iron Ore Fine Australian 62%min CNF China(2)  06-14|Chrome Conc. 46%min FOB Turkey(7)  06-14
  • 120ktpa NCM precursor production line reaches full capacity in Ningde

    2024-05-23 12:03:41   [Print]
    On May 22, a 120ktpa NCM precursor production line reached full capacity after finished products came off production line at Brunp New Material Industrial Park in Ningde.

    Brunp New Material Industrial Park is the first battery material project launched by Guangdong Brunp Recycling Technology Co., Ltd.Asian Metal Copyright Brunp New Material Industrial Park is the first battery material project launched by Guangdong Brunp Recycling Technology Co.Asian Metal Copyright, a subsidiary of Contemporary Amperex Technology Co.Asian Metal Copyright CATL, in Ningde city and is also the biggest lithium battery upstream cathode materials project introduced by Fuding city.Asian Metal Copyright, Ltd.Asian Metal Copyright The first phase of the project was already put into operation, with production capacity of 120,000tpa of NCM precursor, 80,000tpa of NCM cathode material and 60,000tpa of iron phosphate precursor.Asian Metal Copyright (CATL), in Ningde city and is also the biggest lithium battery upstream cathode materials project introduced by Fuding city.Asian Metal Copyright Brunp New Material Industrial Park is the first battery material project launched by Guangdong Brunp Recycling Technology Co.Asian Metal Copyright The industrial park broke ground in December 2020 and became partially operational in 2022 before reaching full capacity in late 2023.Asian Metal Copyright The industrial park broke ground in December 2020 and became partially operational in 2022 before reaching full capacity in late 2023.Asian Metal Copyright The first phase of the project was already put into operation, with production capacity of 120,000tpa of NCM precursor, 80,000tpa of NCM cathode material and 60,000tpa of iron phosphate precursor.

    .Asian Metal Copyright Brunp New Material Industrial Park is the first battery material project launched by Guangdong Brunp Recycling Technology CoAsian Metal Copyright
    Nickel Cathode Norilsk 99.96%min In port China
    Unit:RMB/mt
    China refined nickel producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.