• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Zhejiang Hailiang to build copper project in Morocco

    2024-05-08 11:46:17   [Print]
    Zhejiang Hailiang Co.Asian Metal CopyrightZhejiang Hailiang Co.Asian Metal Copyright, Ltd.Asian Metal Copyright The proposed project, covering a land area of around 304,293 sq.Asian Metal Copyright announced plan to invest USD288 million to build a new energy materials industrial park in Morocco.Asian Metal Copyright, Ltd.Asian Metal Copyright The proposed project, covering a land area of around 304,293 sq.Asian Metal CopyrightZhejiang Hailiang Co.Asian Metal Copyright meters, will be able to produce 50,000t of unwrought copper and alloys, 35,000t of copper pipe, 40,000t of precision brass rod, 150 million pieces of precision copper alloy pipe, and 25,000t of copper foil for lithium battery annually, with a planned construction period of 36 months.

    .Asian Metal Copyright The proposed project, covering a land area of around 304,293 sqAsian Metal Copyright
    Blister Copper TC 98.5%min Delivered China
    Unit:RMB/mt
    Blister Copper TC 98.5%min Delivered China RMB/mt
    China copper concentrate producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.