• Met. Coke A 13%max, S 0.7%max EXW Shanxidown(-50)  08-01|Met. Coke A 13%max, S 0.7%max EXW Hebeidown(-50)  08-01|Met. Coke A 13%max, S 0.7%max EXW Shandongdown(-50)  08-01|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-01|Spodumene Li2O 5%min In port Chinadown(-30)  08-01|Germanium Metal 99.99%min Delivered Europeup(100)  08-01|Cerium Oxide 99%min FOB Chinadown(-50)  08-01|Germanium Metal 99.99%min Delivered USup(100)  08-01|Ilmenite Conc TiO2 46%min Ex-VAT EXW Chinadown(-50)  08-01|Spodumene Li2O 6%min CIF Chinadown(-20)  08-01|Ferro-silicon 75%min In warehouse Rotterdamup(30)  08-01|Cobalt Intermediate 30-40% CIF Chinaup(0.3)  08-01|Spodumene Li2O 3%min In port Chinadown(-20)  08-01|Cobalt Metal 99.8%min Delivered Chinaup(6)  08-01
  • CMOC's TFM copper-cobalt project reaches full production

    2024-03-25 11:59:01   [Print]
    CMOC's TFM mixed ore project in DRC has reached full production capacity with peak daily production of 678t of copper and 36t of cobalt in March, up by 16.Asian Metal CopyrightCMOC's TFM mixed ore project in DRC has reached full production capacity with peak daily production of 678t of copper and 36t of cobalt in March, up by 16.Asian Metal Copyright9% and 9.Asian Metal Copyright0% respectively from the designed capacity.Asian Metal Copyright0% respectively from the designed capacity.Asian Metal Copyright It consists of a 5.Asian Metal Copyright For seven consecutive days, the project's average oxidized ore processing volume at the east region was 12,883t, up by 27.Asian Metal Copyright For seven consecutive days, the project's average oxidized ore processing volume at the east region was 12,883t, up by 27.Asian Metal Copyright6% from the designed capacity, and the average processing volume of mixed ore was 17,677t, up by 4.Asian Metal Copyright It consists of a 5.Asian Metal Copyright0% from the designed capacity.Asian Metal Copyright0% from the designed capacity.Asian Metal Copyright The company expects to see historic high production of copper and cobalt by the end of March.

    TFM copper-cobalt mine is the biggest project invested by China in DRC with a total investment of USD2.51 million.Asian Metal Copyright51 million.Asian Metal Copyright It consists of a 5.Asian Metal Copyright6Mtpa mixed ore production line and a 3.Asian Metal Copyright6Mtpa mixed ore production line and a 3.Asian Metal Copyright The company expects to see historic high production of copper and cobalt by the end of March.Asian Metal Copyright3Mtpa oxidized ore production line at the east region, and a 3.Asian Metal Copyright The company expects to see historic high production of copper and cobalt by the end of March.Asian Metal Copyright5Mtpa mixed ore production line at the central region, which already met its production target in August 2023.

    There are currently five copper-cobalt production lines at TFM project, with ore processing capacity rising from 15,000t to 63,000t a day and its annual copper output exceeding 450,000t, making it to the top ten biggest copper mine and second largest cobalt mine in the world, just after CMOC's KFM mine. With TFM and KFM reaching full production in 2024, CMOC expects to increase copper production by 100,000-150,000t this year.

    .Asian Metal Copyright6% from the designed capacity, and the average processing volume of mixed ore was 17,677t, up by 4Asian Metal Copyright
    NCM 523 Delivered China
    Unit:RMB/mt
    NCM 523 Delivered China RMB/mt
    China cobalt metal producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.