• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Xinjiang Longsheng to build lead and zinc oxide processing project

    2024-02-27 11:57:48   [Print]
    The environmental impact assessment (EIA) for a 300,000tpa lead and zinc oxide processing project developed by Xinjiang Longsheng Zinc Industry Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal CopyrightThe environmental impact assessment EIA for a 300,000tpa lead and zinc oxide processing project developed by Xinjiang Longsheng Zinc Industry Co.Asian Metal Copyright has been released for the first time for public disclosure.

    According to the EIA, the company plans to build production line for processing 300,000 tonnes per annum of lead and zinc oxide and other associated facilities at Yecheng Heavy Industrial Park, with total construction investment of around RMB330 million (USD45.84 million).

    .Asian Metal Copyright Asian Metal Copyright
    Lead Scrap Recycled Deep Cycle Battery Ex-VAT Delivered China
    Unit:RMB/mt
    China secondary lead producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.