• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Silver Age Sci & Tech terminates Congo 3000-metal-ton crude cobalt hydroxide production project

    2023-05-17 15:29:55   [Print]
    On May 16, Silver Age Sci & Tech announced that the company decided to terminate construction of the 3,000-metal-ton crude cobalt hydroxide production project in Congo (Kinshasa).Asian Metal Copyright Its subsidiary Silver Age Congo Cobalt plans to sign an asset transfer agreement with Tengyuan Cobalt Copper on transferring idle fixed assets and related uninstalled equipment in Congo to the latter for USD700,000.Asian Metal Copyright Its subsidiary Silver Age Congo Cobalt plans to sign an asset transfer agreement with Tengyuan Cobalt & Copper on transferring idle fixed assets and related uninstalled equipment in Congo to the latter for USD700,000.

    .Asian Metal CopyrightOn May 16, Silver Age Sci Tech announced that the company decided to terminate construction of the 3,000-metal-ton crude cobalt hydroxide production project in Congo KinshasaAsian Metal Copyright
    Cobalt Chloride 24%min Delivered China
    Unit:RMB/mt
    China battery grade cobalt sulfate producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.