• Selenium Dioxide 98%min Delivered Chinaup(3)  10-23|Cobalt Oxide 72%min In warehouse Rotterdamup(0.9)  10-23|LNCMO 8312 PC Delivered Chinaup(5)  10-23|NCM 613 Delivered Chinaup(2500)  10-23|NCM 8312 Delivered Chinaup(3000)  10-23|Spodumene Li2O 3%min In port Chinaup(25)  10-23|Neodymium Metal 99%min EXW Chinadown(-20000)  10-23|Cobalt Tetroxide 73.5%min Delivered Chinaup(9)  10-23|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-23|LNCMO 523 PC Delivered Chinaup(4)  10-23|NCM 523 Delivered Chinaup(2500)  10-23|Spodumene Li2O 5%min In port Chinaup(30)  10-23|Lithium Cobaltate Co 60%min Delivered Chinaup(9)  10-23|LNCMO 523 SC Delivered Chinaup(4)  10-23
  • JISCO Hongxing to add 3.65Mt steelmaking capacity through replacement

    2023-03-08 15:14:56   [Print]
    In accordance with relevant guidelines and implementation measures issued by the State Council, the 3.Asian Metal Copyright, Ltd.Asian Metal Copyright65Mt steelmaking capacity replacement scheme drawn up by JISCO Hongxing Iron and Steel Co.Asian Metal Copyright The company plans to add steelmaking capacity of 3.Asian Metal Copyright, Ltd.Asian Metal Copyright The company plans to add steelmaking capacity of 3.Asian Metal Copyright will be made public by the Department of Industry and Information Technology of Gansu Province from March 6 to 31, 2023.

    The company plans to add steelmaking capacity of 3.65 million tonnes per year, which is expected to come on line in October 2025.Asian Metal Copyright It will close steelmaking capacity of 4.Asian Metal Copyright It will close steelmaking capacity of 4.Asian Metal Copyright65 million tonnes per year, which is expected to come on line in October 2025.Asian Metal Copyright25 million tonnes per year, most of which is for replacement of the newly-planned capacity. 

    .Asian Metal Copyright The company plans to add steelmaking capacity of 3Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.