• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • Eastern Shenghong's subsidiary to invest RMB18.684 billion in building new energy material project

    2022-11-30 16:32:21   [Print]
    Eastern Shenghong announced on November 29th that its second-tier holding subsidiary, Hubei Haigesi New Energy Co.Asian Metal Copyright684 billion USD2.Asian Metal Copyright, Ltd.Asian Metal CopyrightEastern Shenghong announced on November 29th that its second-tier holding subsidiary, Hubei Haigesi New Energy Co.Asian Metal Copyright, plans to build a supporting raw material & ferric phosphate and LFP new energy material project in order to accelerate the layout of new energy materials.Asian Metal Copyright684 billion USD2.Asian Metal Copyright With the total investment of RMB18.Asian Metal Copyright, plans to build a supporting raw material ferric phosphate and LFP new energy material project in order to accelerate the layout of new energy materials.Asian Metal Copyright684 billion (USD2.Asian Metal Copyright62 billion, the project will have a construction period of two years and will build dressing facilities of 1,800,000tpy, facilities for sulfuric acid production from sulfur-burning of 800,000tpy, facilities for wet-process phosphoric acid of 400,000tpy, purification facilities for wet-process phosphoric acid of 280,000tpy, ferric phosphate facilities of 500,000tpy, LFP facilities of 300,000tpy, water soluble fertilizer facilities of 100,000tpy, special compound fertilizer facilities of 500,000tpy as well as supporting warehouses and public engineering.Asian Metal Copyright62 billion), the project will have a construction period of two years and will build dressing facilities of 1,800,000tpy, facilities for sulfuric acid production from sulfur-burning of 800,000tpy, facilities for wet-process phosphoric acid of 400,000tpy, purification facilities for wet-process phosphoric acid of 280,000tpy, ferric phosphate facilities of 500,000tpy, LFP facilities of 300,000tpy, water soluble fertilizer facilities of 100,000tpy, special compound fertilizer facilities of 500,000tpy as well as supporting warehouses and public engineering.


    .Asian Metal Copyright, plans to build a supporting raw material ferric phosphate and LFP new energy material project in order to accelerate the layout of new energy materialsAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.