• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • Huaxin Industrial signs 3Mtpy high-quality plate project

    2022-11-21 18:00:14   [Print]
    On November 16, Huaxin Industrial signed a contract for 3Mtpy high-quality plate project with the Daye Municipal Government of Hubei Province.Asian Metal Copyright405 billion, the project will mainly build a 1,280m3 blast furnace and a 130-ton converter, as well as public and auxiliary facilities including the construction of sintering, pelletizing and plate production lines, oxygen production, lime kiln, power generation, sewage treatment and others.Asian Metal Copyright With a total investment of RMB10 billion (USD1.Asian Metal Copyright405 billion, the project will mainly build a 1,280m3 blast furnace and a 130-ton converter, as well as public and auxiliary facilities including the construction of sintering, pelletizing and plate production lines, oxygen production, lime kiln, power generation, sewage treatment and others.Asian Metal Copyright405 billion), the project will mainly build a 1,280m3 blast furnace and a 130-ton converter, as well as public and auxiliary facilities including the construction of sintering, pelletizing and plate production lines, oxygen production, lime kiln, power generation, sewage treatment and others.Asian Metal Copyright2 billion USD309 million.Asian Metal Copyright After the project is put into operation and reaches the designed efficiency, it can realize an annual output value of about RMB20 billion (USD2.Asian Metal Copyright After the project is put into operation and reaches the designed efficiency, it can realize an annual output value of about RMB20 billion USD2.Asian Metal Copyright81 billion) and tax payment of about RMB2.Asian Metal Copyright2 billion USD309 million.Asian Metal Copyright2 billion (USD309 million).
    .Asian Metal Copyright2 billion USD309 millionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.