• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • Shandong's installed new energy & renewable energy capacity up by 28.8% YoY in H1 2022

    2022-08-12 11:58:14   [Print]
    Based on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66.Asian Metal Copyright In detail, the installed capacity of solar power generation, wind power generation, biomass power generation and hydroelectric power generation was 37.Asian Metal Copyright37GW, a year-on-year increase of 28.Asian Metal Copyright10GW and 2.Asian Metal Copyright8%, accounting of 37.Asian Metal Copyright6 percentage points higher than the comparative prior period.Asian Metal Copyright3% of the total installed capacity, 5.Asian Metal Copyright77GW, 4.Asian Metal Copyright6 percentage points higher than the comparative prior period.

    In detail, the installed capacity of solar power generation, wind power generation, biomass power generation and hydroelectric power generation was 37.15GW, 19.Asian Metal CopyrightBased on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66.Asian Metal Copyright77GW, 4.Asian Metal Copyright7% and 111.Asian Metal Copyright10GW and 2.Asian Metal Copyright In detail, the installed capacity of solar power generation, wind power generation, biomass power generation and hydroelectric power generation was 37.Asian Metal Copyright28GW respectively, up by 42.Asian Metal Copyright10GW and 2.Asian Metal Copyright5%, 8.Asian Metal CopyrightBased on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66.Asian Metal Copyright7%, 10.Asian Metal Copyright15GW, 19.Asian Metal Copyright7% and 111.Asian Metal Copyright37GW, a year-on-year increase of 28.Asian Metal Copyright3% respectively.
    .Asian Metal Copyright77GW, 4Asian Metal Copyright
    Polysilicon 6N Delivered China
    Unit:RMB/kg
    China silicon metal producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.