• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Ningxia to develop 600ktpy anthracite coal mine

    2022-08-09 16:26:31   [Print]
    An overall planning for the Jiangoushan mining district has been reviewed and approved by Ningxia Development and Reform Commission.Asian Metal CopyrightAn overall planning for the Jiangoushan mining district has been reviewed and approved by Ningxia Development and Reform Commission.Asian Metal Copyright The mining district mainly hosts a deposit of low-ash, low-sulphur, low-phosphorus anthracite coal with reserve totalling nearly 29.Asian Metal Copyright The mining district mainly hosts a deposit of low-ash, low-sulphur, low-phosphorus anthracite coal with reserve totalling nearly 29.Asian Metal Copyright45 million tonnes.Asian Metal Copyright A coal pit Ruitai Coal Mine with capacity of 600,000tpy is planned in the district.Asian Metal Copyright A coal pit (Ruitai Coal Mine) with capacity of 600,000tpy is planned in the district.
    .Asian Metal Copyright45 million tonnesAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.