• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Chengyu Vanadium Titanium Technology's 2 million tons plate project goes into production

    2022-07-04 17:51:31   [Print]
    On June 30, Chengyu Vanadium Titanium Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright held the commissioning ceremony for the 2 million tons of plate project in the vanadium titanium technology factory of Tranvic Group in Lianjie town, Weiyuan county.

    The production line is the first and the only broadband production line in southwest China and in Sichuan and Chongqing. The project was started construction on March 16, 2021 and will have an annual production capacity of 2 million tons with an annual output value of 8 billion yuan (1,194 million US dollars).

    .Asian Metal CopyrightOn June 30, Chengyu Vanadium Titanium Technology CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.