• Magnesium Ingot 99.9%min Ex-VAT FOB China(100)  08-15|Steel Scrap HMS 8mm min EXW Wuxi(90)  08-15|Tin Ingot 99.9%min EXW China(-6000)  08-15|Nickel Cathode 99.96%min EXW China(-5400)  08-15|Nickel Cathode Norilsk 99.96%min In port China(-5300)  08-15|Magnesium Ingot 99.9%min FOB China(100)  08-15|Silicon Metal 5-5-3 Delivered China(500)  08-15|Tin Solder Wire Sn 99%min, Cu 0.7%max EXW China(-6)  08-15|Chrome Conc. 42%min FOB S.A. (-5)  08-15|Steel Scrap MMS 4-6mm EXW Guangzhou(90)  08-15|Magnesium Powder 99.9%min FOB China(100)  08-15|Holmium Oxide 99.5%min EXW China(-25)  08-15|Silicon Metal 4-4-1 Delivered China(500)  08-15|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW China(-6)  08-15
  • Lishen Battery's 24GWh power battery project starts

    2022-06-29 15:18:39   【Print】
    On June 26, Lishen Binhai New Energy Industrial Base project was launched in Binhai High-tech Zone.Asian Metal Copyright49 billion.Asian Metal Copyright Covering an area of 143 acres, the project is invested and built by Tianjin Lishen Battery Joint-stock Co.Asian Metal Copyright After reaching full production, the annual output value of the project is expected to reach RMB12 billion USD1.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright located in Tianjin Binhai High-tech Zone with a planned annual output of 24GWh power batteries and a total investment of over RMB10 billion (USD1.Asian Metal Copyright Covering an area of 143 acres, the project is invested and built by Tianjin Lishen Battery Joint-stock Co.Asian Metal Copyright49 billion).

    It is reported that the project's 24GWh production capacity will be formed through 3 construction phases in 4 years, with each phase to build 8GWh power batteries. After reaching full production, the annual output value of the project is expected to reach RMB12 billion (USD1.Asian Metal Copyright It is reported that the project's 24GWh production capacity will be formed through 3 construction phases in 4 years, with each phase to build 8GWh power batteries.Asian Metal Copyright8 billion), and it will become the largest and most advanced power battery industrial base in North China.

    .Asian Metal Copyright It is reported that the project's 24GWh production capacity will be formed through 3 construction phases in 4 years, with each phase to build 8GWh power batteriesAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99.5%mi producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.