• Cobalt Conc. 6-8% CIF China(-0.4)  08-08|Medium Plate Q235B 10mm In warehouse Guangzhou(130)  08-08|Nickel Cathode 99.96%min EXW China(-5400)  08-08|Nickel Cathode Norilsk 99.96%min In port China(-5400)  08-08|Holmium Oxide 99.5%min EXW China(-30)  08-08|Iron Ore Fine Australian 58% In port China(20)  08-08|Ferro-chrome Indian Cr 58%min, C 8%max CIF China(-0.03)  08-08|Ferro-chrome S.A. Cr 50%min, C 8%max CIF China(-0.03)  08-08|Ferro-holmium 80% EXW China(-30)  08-08|Steel Scrap HMS 8mm min EXW Wuxi(80)  08-08|Iron Ore Fine Brazilian 65%min In port China(25)  08-08|Iron Ore Lump Australian 62%min In port China(25)  08-08|Medium Plate Q235B 16mm In warehouse Guangzhou(120)  08-08|Iron Ore Fine 65%min EXW Benxi(-25)  08-08
  • Benxi Steel Plates sees largest volume in export contract for May

    2022-06-13 18:05:55   【Print】
    In May, Benxi Steel Plates signed export contracts of 123,800 tons, which was a record high.Asian Metal Copyright .Asian Metal Copyright The exports included 100,000 tons of hot-rolled products, 11,000 tons of cold-rolled products and 12,800 tons of galvanized products.Asian Metal Copyright The exports included 100,000 tons of hot-rolled products, 11,000 tons of cold-rolled products and 12,800 tons of galvanized products.Asian Metal Copyright The delivery time of the key products was shortened by 10-15 days on average.Asian Metal Copyright The delivery time of the key products was shortened by 10-15 days on average.Asian Metal Copyright 4,880 tons of the 5,000 tons electrogalvanizing substrate which will be supplied to Dongbu Steel for cold rolling arrived at ports, and the delivery time was shortened by 7-10 days.


    .Asian Metal Copyright The delivery time of the key products was shortened by 10-15 days on averageAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.