Geely Baikuang's Tianlin 400ktpy carbon project starts operation at calcination workshop
2022-06-13 17:08:46
[Print]
The calcination workshop of Tianlin 400ktpy carbon project launched by Geely Baikuang Group Co.Asian Metal Copyright began operation on June 10.Asian Metal Copyright, Ltd.Asian Metal Copyright2 billion USD179 million and covering an area of about 374Mu 24.Asian Metal Copyright began operation on June 10.Asian Metal Copyright2 billion USD179 million and covering an area of about 374Mu 24.Asian Metal Copyright With total investment estimated at RMB1.Asian Metal Copyright, Ltd.Asian Metal Copyright2 billion (USD179 million) and covering an area of about 374Mu (24.Asian Metal CopyrightThe calcination workshop of Tianlin 400ktpy carbon project launched by Geely Baikuang Group Co.Asian Metal Copyright93 hectares), the project adopts DCS or PLC-based control system and is expected to achieve annual production value of RMB3 billion (USD447 million) when reaching full capacity.
.Asian Metal Copyright, LtdAsian Metal Copyright
Graphite Electrode H.P. D500mm EXW China
Unit:RMB/mt
China prebaked anode producers' inventory statistics by province by month
Unit: mt