• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • Lomon Billions to invest in two-phase 150,000tpy electronic-grade LFP project

    2022-05-17 16:42:23   [Print]
    On May 15, Lomon Billions stated that it planned to invest in building a two-phase 150,000tpy electronic-grade LFP project in Nanzhang, Xiangyang.Asian Metal Copyright Phase-one project with a designated 150,000tpy ferric phosphate production capacity is planned to commence construction in the first half of 2022 and is expected to complete construction by the end of June 2023, with the construction cycle expected to last for one year.Asian Metal Copyright Phase-one project with a designated 150,000tpy ferric phosphate production capacity is planned to commence construction in the first half of 2022 and is expected to complete construction by the end of June 2023, with the construction cycle expected to last for one year.

    .Asian Metal Copyright Asian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.