• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Zhongke Electric to invest in building 100,000tpy Li-battery anode material project

    2022-05-16 17:21:48   [Print]
    On May 13, Zhongke Electric announced that it planned to invest around RMB2.Asian Metal Copyright5 billion USD0.Asian Metal Copyright5 billion (USD0.Asian Metal Copyright5 billion USD0.Asian Metal Copyright37 billion) in building a 100,000tpy Li-battery anode material project in Ganmei Industrial Park, Sichuan.Asian Metal Copyright37 billion in building a 100,000tpy Li-battery anode material project in Ganmei Industrial Park, Sichuan.Asian Metal Copyright With a designated annual production capacity of 100,000t of anode materials, the project will be built via two stages and each stage will have an annual capacity of 50,000t.

    .Asian Metal Copyright5 billion USD0Asian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.